CSIRO helping to build resilient telecommunications infrastructure

CSIRO Head Office

Friday, 23 July, 2021

CSIRO helping to build resilient telecommunications infrastructure

Australia’s national science agency, CSIRO, and Optus have released findings of a joint nationwide project to improve bushfire resilience of critical telecommunications. The research analysed where there is risk of damage to the network and where upgrades could reduce vulnerability to future bushfire events.

Since mid-2020, CSIRO and Optus have collaborated on a study of the potential impacts of embers, radiation and flame on and around Optus’s sites with telecommunications equipment. These learnings have been used to assess which sites were most at risk and the priority site design changes.

Information on topography, fuel load, vegetation type and local bushfire weather severity was used to develop maps which then inform resiliency decisions for this critical infrastructure. Optus is implementing the recommended mitigations at two of its sites in Victoria, Seville East and Dixons Creek, as reference examples for a larger, longer-term resiliency program and also to act as demonstration sites to help other infrastructure owners understand the learnings.

These bushfire hazard and planning maps are early examples of the types of products being develop by CSIRO’s National Bushfire Intelligence Capabilities (NBIC) project, which is seeking to develop relevant bushfire hazard mapping products for a wide range of infrastructure types ranging from residential housing to critical infrastructure.

In addition to using the findings to identify and invest in the most impactful upgrades, Optus has developed in-house training and site assessment tools to increase employees’ awareness of the threat to landscape and improve response preparedness. It has started training its contractors to improve future design and builds, or to call out existing site concerns.

Related News

TCCA white paper: Moving on from narrowband?

Top 10 considerations for Euro utilities looking to transition from narrowband to next-gen bearers.

Telstra sells half of its towers business

Telstra has sold close to half of its towers business for $2.8 billion.

WBA OpenRoaming standard chosen

The Telecom Infra Project adopts the open Wi-Fi initiative.


  • All content Copyright © 2021 Westwick-Farrow Pty Ltd